Many Philadelphia families love their neighborhood but need more room. A second story addition over a rear kitchen can add a bedroom or office without leaving the block.
We build these additions in South Philly, Fishtown and Northeast Philadelphia. Each one starts with a close look at the existing walls and foundation.
This guide explains the structural, permit and planning steps involved.
Can Your Rowhome Support a Second Story Addition?
Older rowhomes were not built for extra floors. Therefore, an engineer checks every load path.
- Brick bearing walls. Checked for cracks and mortar condition.
- Foundation. Reviewed for settlement and footing size.
- Existing joists. Often replaced or reinforced.
- Party walls. Shared walls need careful attachment details.
How the Structure Is Built
New loads are carried by beams and posts sized by the engineer.
- Steel or LVL beams set on bearing plates in brick piers.
- New floor joists and subfloor for the upper room.
- Wall framing with sheathing and weather barrier.
- Roof framing with proper drainage to the gutter.
- Fire-rated details at shared walls when required.

Residential construction follows the International Residential Code, which Philadelphia adopts with local amendments.
Second Story Addition Permits and Zoning
Approval is often simpler when:
- The addition stays within height limits.
- Rear yard setbacks are met.
- Plans are stamped by an engineer.
A zoning variance may be needed when:
- The addition exceeds height limits.
- Lot coverage rules are exceeded.
- Neighbors raise concerns.
Planning Your Timeline and Budget
- Engineering and drawings first.
- Permit review before demolition.
- Structure, roof and windows next.
- Interior finishes last.
Clear planning helps you live in the home during much of the work.
Frequently Asked Questions
How long does an addition take? Many rear additions take three to five months after permits.
Can we stay in the house? Often, yes, with planned shutdowns for structural work.
Do neighbors need to approve? Not usually, but zoning notices may apply.
What siding works best? Fiber cement is durable and low maintenance.
Start Planning Your Second Story Addition